Skip to content
  1. Docs
  2. KitStak Pulse
  3. Connected apps

Connect CRM, WMS and Projects

See what Pulse reads from KitStak CRM, WMS and Projects, turn each feed on or off, run Sync now, and know that Pulse never changes their data.

Updated 3 min read


Pulse works on its own. If your workspace also runs KitStak CRM, WMS or Projects, Pulse reads what they know: won deals, work orders, kits built, parts used, warehouse bills and project time. Pulse only reads. It never changes your CRM, WMS or Projects data, and it keeps working if one of them is switched off.

Before you start

  • Connected apps are set up in the KitStak Portal. Pulse shows an app as connected when your plan includes it and it has data for this workspace. See Getting started.
  • Changing the switches needs an admin or the owner.

Open Connected apps

Go to More > Settings and open the Connected apps tab. Each app shows one status:

StatusWhat it means
ConnectedPulse reads this app for your workspace.
Not set up yetYour plan includes it, but it has no data for this workspace yet. Nothing is needed from you.
Not on your planYour workspace does not have this app.

Under each app, Comes into Pulse lists what Pulse reads, with a switch where you can turn a feed off. The card also shows how many jobs are linked and what the last sync brought in.

What Pulse reads from each app

KitStak CRM

What comes inSwitch
A won deal can become a job. Its name, account and value fill in the new job, and the value becomes the quote.Suggest jobs from won deals
The stage of a linked deal shows on its job.

The Won deal with no job alert rule tells you about won deals that have no job yet. See Set alert rules.

KitStak WMS

What comes inSwitch
Kits built on a linked work order come in as units for that day. You add the people and the hours.
Parts a linked work order used come in as materials, at the cost the warehouse has for one part.Pull parts used
Warehouse bills come in as billed amounts for each client. They show what was invoiced and never change profit.Pull warehouse bills
The work order rate on the client's approved warehouse contract becomes the price of a linked job.Let warehouse contract rates set job prices
A work order that is short of parts marks its job, so it shows up as at risk.

When a price is typed in Pulse, the job stops following the contract until the contract's rates change in the warehouse. Parts the client owns cost nothing in Pulse. Their use and scrap are still tracked.

KitStak Projects

What comes inSwitch
Time logged on a linked project comes in as labor hours for that day, costed with your own labor rate.Pull project time
The status and progress of a linked project show on its job.

Project time costs money but stays out of pace, because it is not tied to units.

When Pulse syncs

  • A sync runs by itself every few minutes while Pulse is in use.
  • Select Sync now to run it at once.
  • A sync only adds what is new, so running it again never counts anything twice.
  • Rows that would land in a closed month are left out and counted, for example "3 left out because the month is closed".

Without connected apps

Nothing has to be connected. Every kind of data can come in from a spreadsheet instead. See Import a CSV file.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.