- Docs
- KitStak Pulse
- Connected apps
Link a job to a deal, work order or project
Tie a Pulse job to a CRM deal, a WMS work order or a Projects project, so its status shows on the job, data flows in, and you can jump between the apps.
A link ties a job to the deal, work order or project it belongs to. The linked record shows as a chip on the job, its data flows into the job on each sync, and you can jump between the apps. A job can have more than one link.
Before you start
- Linking needs a manager, admin or owner.
- The other app must be connected. See Connect CRM, WMS and Projects.
- The project list shows only projects you can see in Projects.
Link when you add the job
On the new job page, the Start faster panel can start a job from A won deal or A warehouse work order. The job is linked to that record when you save it. See Add a job.
Link an existing job
- Go to More > Settings and open the Connected apps tab.
- Under Linked records, select Link a job.
- Pick the job.
- Pick the Kind of record: CRM deal, Work order or Project.
- Search for the record. Deals search by name or account, work orders by code, client or kit, projects by name or key. Pulse marks records Already linked to this job, or Also on job another job.
- For a project, tick Count this project's logged time as labor hours on the job if you want its time to come in. A project's time counts on one job only, the first one that asked.
- Select Link record.
Pulse costs project hours with your own labor rate. Time is never counted twice.
What a link does
| Link | What it brings |
|---|---|
| CRM deal | The deal's stage shows on the job. |
| Work order | Kits built come in as units for the day, parts used can be pulled as materials, and a shortage of parts marks the job at risk. |
| Project | Status and progress show on the job. With time counted, logged time comes in as labor hours for each day. |
See and remove links
- On the job's Overview, the Linked records panel lists each link. Select a link to open the record in a new tab, or remove it. A link kept in Projects says This link is kept in Projects. Remove it there.
- On Connected apps, Linked records lists every link in the workspace. For a project link, Count its time turns the time feed on or off. Hours already pulled stay until you delete them.
Programs from Projects
When a KitStak Projects program feeds a job, the job shows which program bills to it, and the Programs tab of Profit adds up the jobs each program feeds. On the job's Overview, a manager can use Link a program.
Related
Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.