Set a target pace

Set how many units one person should finish in an hour by job type, client, labor class or service, use a suggestion, and track pace.

Updated 3 min read


A target pace is your yardstick: for example 42 units per person per hour for kitting. With a target, Pulse can tell you the moment a crew falls behind, and what that costs. The log grid, the job page, the wall display and the risk rules all compare pace with it.

Before you start

  • Setting targets needs a manager, admin or owner. Everyone else sees pace against the targets.
  • Pace is good units divided by labor hours on days that have both. Setup hours and time pulled from Projects are left out, so a changeover day does not make the job look slow.

Add a target pace

  1. Go to More > Target pace.
  2. Select Add a target pace.
  3. Under What the target is for, pick a Job type or an Extra service.
  4. Optionally narrow it to One client (for a client that runs faster or slower) and to One class of labor.
  5. Type the units per person per hour.
  6. Pick Starts on. Days before it keep the older target.
  7. Select Add the target.

Targets with a start day lists every target with what it is for, the client, the labor class, the pace, the start day and Where it came from: Typed in, From history or Time study. Each row can be edited or removed. After a save, jobs it applies to are checked against it again.

Take a suggestion from your history

Once about 20 days are logged, Suggested from your history shows, for each job type:

ColumnWhat it shows
Target nowThe target in use, if any.
History saysThe median pace of the last 20 days with units and hours.
Slowest to fastest dayThe spread, so you can see how steady the work is.
Based onHow many days.

Select Use it to make the suggestion the target.

Set a target for one job

Under Target pace for one job, pick a job and type its own target. You can also type it on the job's Edit dialog. Blank uses the pace for its kind of work.

Which target a job uses

  1. The job's own target pace.
  2. Else the best matching target row that started on or before the day. A row for the job's client wins over one for all clients, then a row for the job's labor class wins over one for all classes, then the latest start day.
  3. Else the plan: planned units over planned labor hours less setup hours.
  4. Else the target pace set on the job type in Settings.

Pace against target

Pace against target shows how the floor did in the period. Group it By job, By labor class or By day. 100% means the crews ran right at their target pace. Each job is measured against its own target. A row with no target says Set a target for the job.

Worked example (made-up figures)

A crew made 1,600 kits in 50 labor hours on its last five days. Pace: 1,600 / 50 = 32 kits per person per hour. With a target of 40, that is 80% of target. On the log grid that row reads A bit slow with the default lines (heads up under 95%, at risk under 80%).

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.