Cost rules and risk limits
Set who buys the parts, the target margin, how time not on a job and company costs are spread, and the limits that make a job Heads up, At risk or Losing money.
Cost rules decide how costs land on jobs and when a job counts as needing a heads up, at risk or losing money. Saving a cost rule or a limit recalculates every open month and checks every job again. Closed months do not move.
Before you start
- Only an admin or the owner can change cost rules.
- Go to More > Settings and open Cost rules.
Cost rules
| Field | Options and what they do |
|---|---|
| Who buys the parts | We do. Parts are our cost or The client does. Parts cost us nothing. The usual answer. A client, a job or one material row can say otherwise. |
| Target margin | The margin you aim for when a job, job type or client has no target of its own. 30% by default. |
| Time not on a job | Spread by labor hours (jobs share it by the hours they used), Spread everything, with paid time nobody logged (also spreads paid hours on no job and no reason), A fixed percent of labor (each job carries a set percent on top of its labor) or Keep it off the jobs (it shows only in company profit). |
| Percent on top of labor | Shown for the fixed percent rule. Each job carries this share of its own labor cost. |
| Spread it over | Shown for the two spread rules: Each day, Each week or Each month. A slow day is shared with the busy days of the same period. |
| Spread company costs by | Calendar days (every day of the month carries the same share, weekends too) or Work days (only your working days carry a share). A whole month is the same either way. |
How each rule works, with a worked example, is in How Pulse does the math.
Risk limits
These limits feed the status rules in How Pulse judges a job, the pace words on the log grid and the wall display.
| Field | Default | What it does |
|---|---|---|
| Losing money when margin is heading under | 10% | The margin floor. A job whose margin is heading under it is marked At risk. |
| At risk when this far under the target | 10 points | Points of margin below the target that make a job at risk. |
| Heads up when labor runs over plan by | 5% | Labor hours over the plan, for the work done so far. |
| At risk when labor runs over plan by | 15% | The same, for at risk. |
| Heads up when pace is under | 95% | Percent of the target pace. Under it, a log row reads A bit slow. |
| At risk when pace is under | 80% | Percent of the target pace. Under it, a log row reads Too slow. |
| Heads up when materials run over plan by | 5% | Material cost per good unit over the plan. |
| Nothing logged for | 3 work days | An active job with no entries for this many work days gets a heads up. |
| Tell me when work not billed yet passes | $5,000.00 | Earned on finished work, with no invoice against it. Used by the not billed alert. |
| And it has waited | How many days the work has waited before the alert fires. |
Worked example (made-up figures)
Your target margin is 30%, the margin floor is 10% and the at risk gap is 10 points.
- A job heading for 26% gets Heads up: a little under target.
- A job heading for 18% gets At risk: more than 10 points under 30%.
- A job heading for a loss of $400.00 at the finish gets Losing money.