Skip to content
  1. Docs
  2. KitStak Pulse
  3. Logging work

Review days and fix entries

Approve or send back the days the floor marked complete, fix odd rows in place, and find, edit, relabel, remove or export any production entry.

Updated 2 min read


Once the floor marks a day complete, a manager checks it before the numbers are used. Pulse points out the rows that look off. The All entries tab is where anyone finds an entry across days and jobs, and where a manager fixes many at once.

Before you start

  • Review the day needs a manager, admin or owner.
  • All entries is open to every role. Changing entries needs a role that may change them.

Review a day

  1. Go to Log work and open Review the day.
  2. Pick To review or Approved, and the site if you have more than one. The list covers the last 21 days, or pick a month.
  3. Open a day. Each day reads Ready for review, Not marked complete or Sent back.
  4. Read Rows that look odd. Select Fix rows here to correct a row without leaving the page.
  5. Select Approve when the day is right.
  6. Or select Send back, type What needs fixing, and confirm. The floor can change the day again and sees your note at the top.

What counts as odd

FlagWhat it means
Units with no hoursA job shows units but no labor hours. Add the people and hours.
Pace under half the targetCheck the hours and the units.
Pace over double the targetLook for a typo.
More hours logged than were paidCheck the paid hours and the entries.
Ran the day before, nothing todayA job ran the work day before but has nothing logged here.

An approved day can still be changed by a manager, and the numbers update right away. Open the day again on Log work reopens a day that was marked complete.

Find an entry

  1. Go to Log work and open All entries.
  2. Narrow the list with From day, To day, the site, Labor class, Where the entry came from, and Search job or note.
  3. Turn on Needs hours to see only rows with units and no hours.

Each row shows the day, job, labor class, units good, people, labor hours, labor cost, source and note. Rows in a closed month show Closed.

Fix many entries at once

  1. Tick the entries, or Choose every entry on this page.
  2. To move them to another labor class, pick it under New labor class for the chosen entries and select Set labor class. Labor cost is worked out again with the new real cost of an hour.
  3. To remove them, use the remove action. Select Put back on the toast to undo.

To edit one day, select its edit button. The edit form has Hours each, Overtime hours (part of the labor hours) and Setup hours (do not count in the pace). Undo puts the day back the way it was, unless it was changed again after your save.

Export entries

Export the filtered list as a CSV file. The file can be changed in a spreadsheet and imported back with the Production template.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.