Skip to content
  1. Docs
  2. KitStak Projects
  3. Programs

Plan builds and log output

Add builds by hand, with the planner or from a schedule, log what the floor built each day, close a day short or move the rest, and use Floor today.

Updated 5 min read


A build is one batch of one variant for a day. You plan builds ahead, by hand, in the build planner or with a schedule, and the floor logs what got built each day. Revenue, the statement and Pulse stay up to date on their own.

Before you start

  • Editors and owners of the program can plan builds and log output. Others see You can view output. Editors can log it.
  • The program needs variants before you plan builds. Otherwise the Builds tab says Add variants before you plan builds.

Add one build

  1. In the program, press B, or open the program menu and select New build. You can also pick New build from More ways to create in the top bar.
  2. Type it like build 100 small brown glove tomorrow in Describe the build. The program, variant, quantity and day are picked out as you type.
  3. Check the Program or project and the Variant. If a word is close to more than one variant, Projects asks Did you mean and offers choices.
  4. Select Create build, or press Enter. Tick Add another to keep going.

Build quick add words

PartExampleNotes
buildbuildStarts build mode in quick add
Quantity100Planned units
Variant wordssmall brownMatched against the program's variant names, keys and SKUs
Programglove or +KITSA word of the program name, or its key
Daytomorrow, fri, next monThe same date words as tasks. See quick add syntax reference
Assignee@danaSame as tasks
Priority!highSame as tasks

A build can also live in an ordinary project. It then has no variant and is priced by its build rate or its Pulse job.

Plan many builds with the planner

  1. In the program, select Plan builds, or press Shift B.
  2. The grid shows variants down the side and days across the top. Type a quantity in each cell.
  3. Use the keyboard: arrow keys move, Ctrl D fills right, Ctrl Shift D fills down, and Delete clears cells.
  4. To copy a block from a spreadsheet, select Paste from a spreadsheet or press Ctrl V. The first column is the SKU or variant, the next columns are the days shown, with a date header row.
  5. Optional: select Apply schedule to fill the grid from a schedule, or Bring in to import a CSV.
  6. Check the summary, then select Create builds, or press Ctrl Enter.

Cells that already have a build are skipped. When the program has history, builds from the last 4 weeks suggest quantities.

Let a schedule make builds

A schedule makes builds ahead of time on the days you pick. Each day it makes is one run. Set one up on the Schedule tab. See variants, price cards and month close.

The Builds tab

ControlWhat it does
Builds viewBoard, List, Table, Timeline, Calendar or Runs
Date rangeThe days shown, or a Custom range
Work typeBoth, Tasks or Builds
VariantShow one or more variants
Unplanned and ShortOnly builds made while logging output, or only builds closed below plan
Bring inImport output (a CSV with date, SKU or variant, qty) or Import plan (makes planned builds from a CSV)
ShareExport CSV, Print build tickets (one ticket per build in the range) and Share report (the production report for the week)

The Runs view groups the day's builds by run, with what was built and what is left.

Log output for a day

  1. In the program, select Log output, or press O. From Floor today or the Programs page, pick the program first.
  2. Move between days with Day before and Day after. Output can be logged for today or earlier.
  3. For each build, type what was Built. Press Enter for the next row, Shift Enter for the previous one, and = to fill the remaining quantity.
  4. To scan, press / to jump to Scan or type a SKU and scan or type the SKU. Projects jumps to that build's row. Turn on Count each scan to add to the row on every scan instead.
  5. Optional: show scrap with Show scrap, or add a note to a row.
  6. Mark done closes a build when it is full. Uncheck it to keep the build open.
  7. Select Save, or press Ctrl Enter.

If the floor built something nobody planned, add a new row with Variant for the new row and Built for the new row. It becomes an Unplanned build where planned equals built.

If someone else logs output on the same build while you type, Projects tells you how much changed and shows the new total.

Close the day

  1. Select Save and close the day.
  2. For each build still below plan, choose Close short and give a reason, or Leave open, or move the rest to the next work day.
  3. Confirm.

A closed day can't change. Owners can reopen the month from Settings > Month close.

Floor today

  1. Go to Floor today in the sidebar, or press G then F.
  2. Pick the day with Day before and Day after.
  3. Each running program shows its builds for that day. Log output program by program.
  4. When everything is in, select Close the day for all. Builds still below plan are listed by program, with Close short or Leave open for each.

Change a build

Open a build's menu:

ItemWhat it does
Change variantPicks another variant
Move to dayTomorrow, Next work day, or Pick a date
DuplicateMakes a copy
Move to program or projectMoves it to another program or project
Delete buildDeletes it. Only when nothing was logged

The build page shows its Run, Schedule, Variant, Planned, Built, Remaining and Scrap, where its revenue goes (Revenue goes to), and every day's output. People who manage the program's prices can Set build rate to price one build differently from the card, or go back with Use card rate.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.