Skip to content
  1. Docs
  2. KitStak Projects
  3. Views

Views, filters and saved views

Filter any project view by person, status, priority, label or due date, save the layout as a view for you or the team, and edit many tasks at once.

Updated 3 min read


Every project shows the same tasks in six views: Board, List, Table, Timeline, Calendar and Workload. Each view has a filter bar at the top. Filters and layout choices live in the page address, so you can share a link to exactly what you see, and you can save them as a named view.

Before you start

  • Anyone on the project can filter and save a view for themselves. Sharing a view with the project needs the Editor or Owner role.

Filter a view

The filter bar on Board, List and Table has these parts, from left to right.

ControlWhat it does
ViewsPick a saved view, or All tasks for every task with your own filters
Search tasksMatches the title and the key, such as OPS-42. Press / or Ctrl F to jump to it
MineOnly my tasks shows tasks assigned to you
FilterOpens filters for Assignee, Status, Priority, Labels and Due
DisplayThe layout options for this view
SaveSaves your changes to the view you are on
ResetReset filters and layout, or Reset to the saved view

Active filters show as chips. Select a chip to change it, or its × to remove it.

Filter options

FilterChoices
AssigneeMe, Unassigned, or any person
StatusAny of the project's statuses
PriorityUrgent, High, Medium, Low, No priority
LabelsAny label, or No label
DueOverdue, Due today, Due this week, Due in the next 7 days, No due date

In programs, a Work type filter also picks Tasks and builds, Tasks or Builds.

Projects remembers the last filters you used in each view of each project, and brings them back when you return.

Save a view

  1. Set up the filters, grouping and sorting you want.
  2. Open Views and select Save as a new view….
  3. Give it a Name, such as My urgent tasks.
  4. Under Who can use it, pick Just me or Everyone on the project.
  5. Optional: turn on Open this view first to open it whenever you open this view.
  6. Select Save view.

A view you change shows Unsaved changes. Select Save to update it, or reset to go back.

Manage saved views

Open Views while a saved view is active:

  • Rename the view.
  • Open this view first, or Stop opening this view first.
  • Delete the view. For a shared view, everyone on the project loses it. Tasks stay exactly as they are.

Only project editors can share views with everyone. If you are not an editor, a view you save is just for you.

Timeline, Calendar and Workload have their own Saved views menu with the same choices: Only you or Shared with the project.

Edit many tasks at once

  1. In List or Table, tick the box next to each task, or press X on a task. Shift and click selects a range.
  2. Use the bar that appears at the bottom.
ButtonWhat it does
StatusMoves every selected task to a status
AssignSets the assignee
PrioritySets the priority
DueSets the due date
LabelsAdds a label to every selected task
MoveMove to section, or Move to another project
DeleteDeletes them, with Undo

Press Esc or select Clear selection (Esc) to stop. You can also press Ctrl K for the selection commands. See search and the command palette.

Undo

Moves, edits and deletes show an Undo button in a message at the bottom of the screen. Press Ctrl Z to undo the last one.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.