Set objectives with key results, link the projects behind them, measure progress three ways, nest smaller goals and post regular check-ins.

Updated 2 min read


A goal is an objective your team is working toward, such as “Ship every order within 24 hours”. You measure it with key results, the projects behind it, or a percent you set by hand, and you post check-ins to say how it is going.

Before you start

  • To create and change goals you need the Member, Admin or Owner role in the workspace.

Create a goal

  1. Go to Goals and select New goal.
  2. Enter the Goal, such as Ship every order within 24 hours.
  3. Optional: write Why it matters.
  4. Pick the Owner.
  5. Pick the Time frame: a quarter, such as Q1 2027, or your own Starts and Due dates. The due date has to be after the start.
  6. Under Part of a bigger goal, pick a parent goal, or No, it’s a top goal.
  7. Pick How progress is measured.
  8. Optional: pick Linked projects and a Color.
  9. Select Create goal.

How progress is measured

ChoiceHow it works
From key resultsAverage of the key results
From linked projectsAverage of the projects’ completed tasks
Set by handYou update the percent at each check-in

Add key results

  1. Open a goal's menu and select Add key result.
  2. Write what you will measure, such as Ship 500 orders a day.
  3. Pick how it is Measured as.
  4. Fill in the Start value and Target value, and a Unit if it helps.
  5. Select Add key result.
Measured asUse it for
NumberCounting something, like orders shipped
PercentA percentage, like on-time rate
MoneyAn amount, like revenue
Done or notSomething that happens once. It is 0% until done, then 100%
Project progressFills in from a project’s tasks

Progress counts from where a key result started, not from zero. A key result whose target is lower than its start counts as going down, and shows Lower is better. Moving the wrong way since the start counts as 0%.

To change a key result's number quickly, select it on the Goals page and type the new value.

Check in on a goal

  1. Select Check in on the goal.
  2. Pick How is it going?: On track, At risk, Off track, Achieved or Missed.
  3. Update the current value of each key result, or Progress today (%) for goals set by hand.
  4. Optional: write a Note.
  5. Select Save check-in.

Every check-in is kept. Open Details and history from the goal's menu to see them. When a linked project's health is at risk or off track, the goal shows a hint to check in.

Nest goals

Select Add a smaller goal from a goal's menu to add a goal under it. The Goals page shows the tree, with each goal's progress.

Find goals

Use Find a goal, Health (Any health or one health) and Time frame (Any time frame or one) to narrow the list. The header shows the Average progress of top goals.

  • In the goal dialog, pick Linked projects.
  • A project's Overview lists its goals. A project not linked yet says Not linked to a goal yet. Link it from the Goals page.

Change or delete a goal

Open the goal's menu and select Edit goal or Delete goal. A deleted goal shows an Undo button right after.