Skip to content
  1. Docs
  2. KitStak Projects
  3. Projects and tasks

Work with tasks

Open a task in the side panel or as a full page, set its status, people, priority, dates, estimate, labels and milestone, and copy, move or delete it.

Updated 3 min read


A task is one piece of work in a project. Every task gets a short key made of the project key and a number, such as OPS-42, that people can say out loud and type into search. This page covers the task panel and everything you can set on a task.

Before you start

Open a task

  • Select a task on any board, list, table, calendar or timeline. It opens in a side panel. The page behind stays usable: select another task and the panel switches to it.
  • Use the up and down arrows, or J and K, to walk through the tasks in the order the page shows them. The panel header shows where you are, such as Task 3 of 12.
  • To open the full page, select Open full page. The address is the project key and number, such as /p/OPS/42.
  • Add ?task=OPS-42 to any Projects address to open that task's panel there.

Task properties

PropertyWhat it holds
StatusOne of the project's statuses. See statuses and workflow
AssigneeThe one person doing the work. Assign to me takes it. Empty shows No one yet
ReporterThe person who asked for it. It starts as whoever created the task
PriorityUrgent, High, Medium, Low or No priority
Start dateWhen work starts. Empty shows No start date
Due dateWhen it must be done. Empty shows No due date
EstimateStory points, Time it should take, or both
LabelsAny number of labels. Add labels creates new ones
MilestoneOne of the project's milestones, or No milestone
Custom fieldsEvery custom field the project has. See custom fields

Below the properties come the Description, Subtasks, Dependencies, Linked records, Files, Time and the comments and history.

Rules for dates and estimates

  • The start date has to be on or before the due date. In the date picker, days past the other date are shaded. Picking one moves the other date too (Moves due too, Moves start too).
  • Story points must be a whole number from 0 to 1000.
  • Type time like 45m, 2h or 1h 30m. If you type a time in the points box, Projects moves it to Time it should take.
  • Leave a box empty to clear it.

Write the description

Select Add details: what needs to happen, links, a checklist… and type. The description Saves by itself about a second after you stop typing, when you leave the box, when you press Ctrl S, and when you close the panel.

The formatting bar offers Heading, Bulleted list, Numbered list, Checklist, Quote, Code block, Inline code, Italic, Strikethrough and Add link.

Mark a task done

  • Select the round check next to the task, or Mark done in the panel header.
  • Or press Ctrl Enter with the task open or selected.

The task moves to the project's first done status. Reopen moves it back to the status new tasks start in. A task that is still waiting on open tasks shows a yellow note, such as Waiting on another task., with links to the tasks to finish first.

The task menu

Open More actions in the panel header.

ItemWhat it does
Copy linkCopies the task's address
Copy task keyCopies the key, such as OPS-42
Open full pageOpens the task on its own page (in the panel only)
Follow this taskSends you its updates. Stop following ends that
Mark doneMoves it to the done status. Reopen if it is done
Close without doing itMoves it to the project's cancelled status, if it has one
DuplicateMakes a copy. Subtasks are copied too
Move to projectMoves the task and its subtasks to another project
Make it a subtask of…Puts it under another task. Make it a regular task takes it out again
Delete taskDeletes it and its subtasks. You can undo right after

Right-click a task in a view for a shorter menu with Status, Priority, Assign, Labels, Due date (with Today, Tomorrow and In a week) and Move to project.

Rules Projects checks

  • Every task needs a name, up to 500 characters.
  • You cannot add tasks to an archived project. Restore it first.
  • A subtask moves with its parent. To move it to another project, move the parent.
  • The assignee must be a member of the workspace.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.