- Docs
- KitStak Projects
- Projects and tasks
Work with tasks
Open a task in the side panel or as a full page, set its status, people, priority, dates, estimate, labels and milestone, and copy, move or delete it.
A task is one piece of work in a project. Every task gets a short key made of the project key and a number, such as OPS-42, that people can say out loud and type into search. This page covers the task panel and everything you can set on a task.
Before you start
- To add or change tasks you need the Editor or Owner role on the project. Commenters can comment and upload files. Viewers can only look. See roles and permissions.
- To create tasks, see add tasks with quick add.
Open a task
- Select a task on any board, list, table, calendar or timeline. It opens in a side panel. The page behind stays usable: select another task and the panel switches to it.
- Use the up and down arrows, or
JandK, to walk through the tasks in the order the page shows them. The panel header shows where you are, such as Task 3 of 12. - To open the full page, select Open full page. The address is the project key and number, such as
/p/OPS/42. - Add
?task=OPS-42to any Projects address to open that task's panel there.
Task properties
| Property | What it holds |
|---|---|
| Status | One of the project's statuses. See statuses and workflow |
| Assignee | The one person doing the work. Assign to me takes it. Empty shows No one yet |
| Reporter | The person who asked for it. It starts as whoever created the task |
| Priority | Urgent, High, Medium, Low or No priority |
| Start date | When work starts. Empty shows No start date |
| Due date | When it must be done. Empty shows No due date |
| Estimate | Story points, Time it should take, or both |
| Labels | Any number of labels. Add labels creates new ones |
| Milestone | One of the project's milestones, or No milestone |
| Custom fields | Every custom field the project has. See custom fields |
Below the properties come the Description, Subtasks, Dependencies, Linked records, Files, Time and the comments and history.
Rules for dates and estimates
- The start date has to be on or before the due date. In the date picker, days past the other date are shaded. Picking one moves the other date too (Moves due too, Moves start too).
- Story points must be a whole number from 0 to 1000.
- Type time like
45m,2hor1h 30m. If you type a time in the points box, Projects moves it to Time it should take. - Leave a box empty to clear it.
Write the description
Select Add details: what needs to happen, links, a checklist… and type. The description Saves by itself about a second after you stop typing, when you leave the box, when you press Ctrl S, and when you close the panel.
The formatting bar offers Heading, Bulleted list, Numbered list, Checklist, Quote, Code block, Inline code, Italic, Strikethrough and Add link.
Mark a task done
- Select the round check next to the task, or Mark done in the panel header.
- Or press
CtrlEnterwith the task open or selected.
The task moves to the project's first done status. Reopen moves it back to the status new tasks start in. A task that is still waiting on open tasks shows a yellow note, such as Waiting on another task., with links to the tasks to finish first.
The task menu
Open More actions in the panel header.
| Item | What it does |
|---|---|
| Copy link | Copies the task's address |
| Copy task key | Copies the key, such as OPS-42 |
| Open full page | Opens the task on its own page (in the panel only) |
| Follow this task | Sends you its updates. Stop following ends that |
| Mark done | Moves it to the done status. Reopen if it is done |
| Close without doing it | Moves it to the project's cancelled status, if it has one |
| Duplicate | Makes a copy. Subtasks are copied too |
| Move to project | Moves the task and its subtasks to another project |
| Make it a subtask of… | Puts it under another task. Make it a regular task takes it out again |
| Delete task | Deletes it and its subtasks. You can undo right after |
Right-click a task in a view for a shorter menu with Status, Priority, Assign, Labels, Due date (with Today, Tomorrow and In a week) and Move to project.
Rules Projects checks
- Every task needs a name, up to 500 characters.
- You cannot add tasks to an archived project. Restore it first.
- A subtask moves with its parent. To move it to another project, move the parent.
- The assignee must be a member of the workspace.
Related
Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.