- Docs
- KitStak Projects
- Programs
Create a program
Set up a program with the guided wizard or Quick setup: basics, variants, a price card, an optional schedule, people and links. Drafts save as you go.
The New program wizard sets up a program in up to six steps: Start, Basics, Variants, Price card, Schedule and Links and review. For a simple program, Quick setup does it on one page. Drafts save as you go, so you can stop and come back.
Before you start
- You need the Member, Admin or Owner role in the workspace. Otherwise the wizard says You can't create programs in this workspace.
- To start from a won deal, your organization needs KitStak CRM. To link a Pulse job, it needs KitStak Pulse.
Pick how to start
Go to Programs and open the New program menu, or pick New program from More ways to create in the top bar.
| Choice | What it does |
|---|---|
| From scratch | Set up variants, rates and a schedule |
| Quick setup · one page | Name, kits and one rate on one page |
| From a won CRM deal | Use the deal's customer, value and rates |
| From a template | Start from a saved program template |
| Copy a program | Copy variants, rates and schedules |
| Resume a draft | Pick up a draft you saved |
On the Start step, the same choices show as cards under How to start. A deal that already has a program shows Has a program. When you copy a program, pick What to copy: Variants, Price card, Schedules (copied as paused until you turn them on), Members and Links.
Step: Basics
- Pick a color and icon, and enter the Program name.
- Check the Key. Builds use it: with the key
KITS, builds areKITS-1,KITS-2and so on. - Optional: pick the Customer, a shared customer or a CRM account, and add a Description.
- Pick the Owner. The owner runs the program and manages its people.
- Set Starts. Leave Ends empty for an ongoing program.
- Pick the Time zone. Days and today are counted in this zone in every app.
- Under What do builds count?, pick kits, orders, units, packs or boxes, or Other and type the One and Many words, such as
caseandcases. - Under Work days, leave Use the workspace calendar on, or turn it off to pick this program's own days. Optional: add Days off for this program and Extra work days.
- Optional: set a Monthly revenue target.
- Select Continue.
Step: Variants
Pick How to add variants:
- Make a matrix: add up to 4 attributes, such as Size and Color, and their values. Each mix of values becomes one variant. Under Names and SKUs, set how names, keys and SKUs are built. Select rows or columns to Set qty or Set rate for many at once. Add Rates by attribute to price every variant with one value the same way.
- Paste a list: paste SKUs or rows from a spreadsheet. Projects finds the attributes for you.
- Add one by one: type each variant's Name, Key, SKU, Default qty and Rate, then Add variant.
When the program has a customer, select Match kits to link variants to that customer's kits by SKU. A matched variant shows Kit found.
Step: Price card
- Pick Add prices now, or Set prices later. Without a price card, output is logged as No price until you publish one; then the open days get their prices.
- Set Price card starts. Version 1 is in force from this day.
- Under Work charges, set the rate per unit, and optional Per batch (charged each time a build is marked done) and Per hour lines.
- Under Fixed, add an optional Monthly fee. Under Minimum, add an optional Monthly minimum.
- Optional: Add a setup fee with its Charge on date. Setup fees are charged once on their date.
What this card earns shows what one run of every variant earns, and about how much a month at this schedule earns. From a deal, the card shows what came from the deal, with Use as monthly minimum and Use as target.
Step: Schedule
This step is optional. Select Skip to plan builds by hand.
- Turn on Make builds on a schedule and give it a Name. This is the run name everywhere.
- Pick Repeats: Every day, Every work day, On certain days or Every few weeks.
- Set the First day, an optional Last day, and how many days to Make builds ahead.
- Leave Skip days off on to skip holidays and days off.
- Under What to build each time, tick each variant to Include, set its Qty, and optionally Vary by day or pick an Assignee.
The Preview shows the next two weeks.
Step: Links and review
- Under People, select Add people and pick each person's role.
- With CRM, link the deal and account.
- With Pulse, pick Do not link a job, Link an ongoing job or Make a new Pulse job. Output and fees go to the job, for cost and margin.
- Optional: link Related projects.
- Check the Review and select Create program.
Drafts
- Select Save draft at any time. Drafts save once the program has a name.
- Closing with unsaved changes asks Leave without saving?: Save draft, Discard or Keep editing.
- Find a draft later under New program > Resume a draft.
Quick setup
- Choose Quick setup · one page.
- Enter the Program name, Key, Customer and What do builds count?.
- Paste your kits, or add them one by one.
- Add a price per unit, or choose Set prices later.
- Optional: turn on Make builds every work day and set How many of each.
- Select Create program.
Everything else takes its default. You can change it later in the program's tabs.
Rules Projects checks
- The name is required, and the key follows the same rule as project keys: 2 to 6 letters or numbers, starting with a letter, not used by another project or program.
- A program needs at least one work day.
- A matrix can have up to 4 attributes, 30 values each, and make up to 200 variants at once.
Related
Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.