Table view

Work with a project's tasks as a spreadsheet: choose and resize columns, edit cells in place, sort, group, see totals and download a CSV.

Updated 2 min read


The Table tab shows a project's tasks as a spreadsheet. Every field is a column, custom fields included. Edit any cell in place, sort and group by columns, and download what you see as a CSV file.

Before you start

  • To edit cells you need the Editor or Owner role on the project.

Columns

ColumnWhat it shows
IDThe task key, such as OPS-42
TaskThe task name. It always shows and stays in place as you scroll
StatusThe task's status
AssigneeWho does the work
PriorityUrgent to No priority
Start date and Due dateThe task's dates
LabelsIts labels
SectionIts section, or No section
PointsStory points
Time estimateThe time it should take
SubtasksHow many subtasks are done
CycleThe cycle it is in
Linked toLinked CRM and WMS records
CustomerThe linked customer
Created and UpdatedWhen it was made and last changed
Custom fieldsOne column per custom field, under Custom

Choose, order and resize columns

  1. Select Columns in the filter bar.
  2. Turn columns on or off. Drag them to change their order.
  3. To resize a column, drag the edge of its header.

Select Add a column at the end of the header row to turn on another column. When every column is on, it says Every column is showing.

Edit cells

  • Select a cell and type, or press Enter to edit it. Press Esc to cancel.
  • Move with the arrow keys. Tab goes to the next cell.
  • Select Open next to a task name to open the task.

Sort and group

  • Select a column header to sort by it. Hold Shift and select another header to add a second sort.
  • Open a header's menu for Sort A → Z / low → high, Sort Z → A / high → low, Remove this sort, Group by that column and Hide column.
  • Or open Display and pick Group by: No grouping, Status, Assignee, Priority, Section, Label or a single choice Custom field.

Totals

The last row adds up number columns for the tasks you can see, such as points, time estimates and number or money custom fields. Point at a total to see Total of the shown tasks.

Display options

OptionWhat it does
Group byGroups the rows
Done tasksShows or hides done tasks
Subtasks as rowsShows subtasks as their own rows
Download as spreadsheet (CSV)Downloads the shown rows and columns

Download a CSV

  1. Set the filters and columns you want.
  2. Open Display and select Download as spreadsheet (CSV).

The file holds exactly the rows and columns you see. Open it in Excel, Numbers or Google Sheets. Accented names open correctly in Excel.

Add tasks and edit many at once

Type in Add a task at the bottom of the table, or at the bottom of a group. Tick rows, or press X, to select them for the bulk bar. Select every task with the box in the header. See views, filters and saved views.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.