Skip to content
  1. Docs
  2. KitStak Projects
  3. Quick add

Add tasks with quick add

Press C anywhere and type a task as one line. Quick add reads the due date, priority, assignee, labels and project out of what you type.

Updated 3 min read


Quick add is the New task box. Type a task as one sentence, such as Order pallet wrap next fri !high @dana #supplies, and quick add fills in the due date, priority, assignee and labels for you. Chips under the box show what it understood, and you can still set every field by hand.

Before you start

  • You need the Editor or Owner role on at least one project. Quick add only offers projects you can add tasks to.

Open quick add

  • Press C anywhere.
  • Select New task in the top bar.
  • In a project, select Add task in the header. The task goes into that project.
  • In the command palette, type your task and select New task “your words”.

Add a task

  1. Type the task name with any details. See the quick add syntax reference for every word quick add understands.
  2. Check the chips under We understood:. Each chip shows a date, priority, person, label or project that was read out of your text.
  3. Optional: set or change Project, Status, Assignee, Due date, Priority and Labels with the pickers. A picker you change wins over the text, and the matching word leaves the name.
  4. Optional: select Add details and add notes, links or steps.
  5. Select Add task, or press Enter.

To add the task and open it straight away, select Add and open or press Ctrl Shift Enter. Tick Add another to keep the box open for the next task.

Which project the task goes into

Quick add picks the project in this order:

  1. A +KEY or +name in your text.
  2. The project you picked with Project.
  3. The project you are looking at.
  4. The project you used last.
  5. The first project you can add tasks to.

Chips and what they mean

ChipMeaning
A date, such as Fri, Dec 4The due date it will use
Urgent, High, Medium, Low, No priorityThe priority
A person's nameThe assignee. @me shows Me
A label nameA label that will be added
A label name with (new)A label that will be created when you save
A project nameThe project the task goes into
A red chip, such as No one named samA name that matched nobody. The task stays unassigned
A red chip, such as No project called xyzA project that matched nothing. The text stays in the name

Select × on a chip to Keep as plain text: the words stay in the task name and are not used as a field.

New labels

On a project where you are an editor or owner, a #name that matches no label becomes a new label when you save. Otherwise you see a warning chip, such as No label called supplies, and the text stays in the name. In the Labels picker, type a name and select Create label to add one by hand.

When your organization runs KitStak WMS, a warehouse code in the task name links the task to that record. Type a receipt, order, work order or count code, such as PO2240, SO10482, WO94 or CNT144.

  • Quick add writes the code the way WMS does, with six digits: PO2240 becomes PO002240.
  • A Links to chip shows the record. Select Don't link on it to leave it out.
  • Up to three codes are linked from one name.

Rules quick add checks

  • A task needs a name. If only tokens are left, quick add asks you to add a few words for the task name.
  • A task needs a project. Pick one if quick add cannot find one.

Something missing or unclear? Tell us and we will fix the page. To see it in your own data, book a walkthrough.