Plan short rounds of work with a goal, pull tasks in from the backlog, follow the burndown, and roll unfinished work into the next cycle.

Updated 2 min read


A cycle is a short round of work inside a project, usually one or two weeks, with a goal the team can check the work against. You pull tasks from the backlog into the cycle, follow its burndown, and when it ends, unfinished work rolls into the next one.

Before you start

  • You need the Editor or Owner role on the project to plan, edit or close cycles.

Plan a cycle

  1. Open the project and select the Cycles tab.
  2. Select Plan a cycle.
  3. Optional: give it a Name, such as Peak prep week 1. Leave it empty to call it by its number, such as Cycle 3.
  4. Pick the Start date and End date, or select 1 week, 2 weeks or 3 weeks to set the length.
  5. Optional: write a Goal, one sentence the team can check the work against.
  6. Leave Roll over unfinished work on to move open tasks to the next cycle when this one ends.
  7. Select Plan cycle.

Cycle rules

  • The end date has to be on or after the start date.
  • A cycle can be up to 13 weeks long.

Add tasks to a cycle

  1. Open the cycle on the Cycles tab.
  2. Under Backlog, find tasks with Find a backlog task. The backlog holds the project's open tasks that are not in a cycle yet.
  3. Tick the tasks you want.
  4. Select Add and the number of tasks, such as Add 4 to cycle.

To take a task out, select the remove button next to it in In this cycle.

A task is in one cycle at a time. Subtasks follow their parent task, so add the parent. Tasks from one project only. A closed cycle cannot take new tasks.

Follow a cycle

Each cycle is Current, Upcoming or done. The current cycle shows:

NumberWhat it means
DoneThe share of tasks finished, and how many of how many
Left to doOpen tasks, plus points left when tasks have points
Scope changeTasks added or taken out after the cycle started
Rolled overTasks that moved on, or will move on if still open at the end

The Burndown chart shows Work left against an On-time pace line. Staying under the dashed line means the cycle is on pace. The Scope changes chart shows tasks added (up) or taken out (down) after the cycle started.

On the Board and List tabs, a slim strip shows the current cycle, its dates, days left, progress and goal, with Open cycle.

Close a cycle

A cycle closes by itself once its end date has passed. With Roll over unfinished work on, open tasks move to the next cycle, and Projects plans the next one for you with the same length if there isn't one.

To close it early:

  1. Open the cycle and select Close cycle.
  2. Under Unfinished tasks, pick Move to next cycle or Back to backlog.
  3. Select Close cycle.

To change a cycle's name, dates, goal or rollover, select Edit. To delete it, select the bin button next to Close cycle.

See cycles in the table

The Table view has a Cycle column that shows each task's cycle.